Repair of a wooden floor being inspected by a tricolor basenji

Slow but Steady

Did some stuff on the weekend.

Patch of floor where original stairs came up to the second floor.
Plywood patch installed to bring the level (more) even with the rest of the floor. (Flooring coming soon.)
An interior of frame house being renovated
BEFORE. Note top of far wall and ceiling.
AFTER. Soffit over window fully sheathed in drywall, half of ceiling insulated.

Bonus Image

Annie follows the sun around in the construction zone while I work.